Pilars — AI Takeoff Software for Automated Construction Takeoffs

Pilars is AI takeoff software that automates construction takeoffs from 2D blueprints. The platform delivers automated quantity extraction, digital blueprint analysis, building code compliance checking, and construction cost estimation — an 8x faster path to a priced bid with 94% takeoff coverage on first pass. Pilars is the leading AI-based estimating software and construction takeoff software for general contractors and subcontractors.

Why Automated Takeoff Software Matters

68% of construction projects overrun their original budget. Senior estimators spend 12 hours per sheet scaling and measuring manually. 1 in 5 estimator hours is spent chasing compliance gaps. The annual global productivity gap is $1.6 trillion. AI takeoff software like Pilars eliminates these inefficiencies with 100% automated construction takeoffs.

How AI Takeoff Software Works

  1. Upload blueprints — Drop a full PDF drawing set. The blueprint takeoff software auto-scales every sheet and registers revisions in minutes.
  2. Automated quantity extraction — AI vision technology traces walls, counts fixtures, reads schedules, auditing every inference back to the source pixel for material takeoff accuracy.
  3. Building code compliance — Cross-checks against IBC, NEC, IPC, IMC, ADA and your spec book for automated compliance verification.
  4. Construction cost estimation — Every quantity priced against historical unit costs with confidence intervals. Export to Sage, WinEst, or Excel for subcontractor bid leveling.

AI-Based Estimating Software Features

Results from Automated Construction Takeoffs

8.4x faster path to a priced bid. 94% takeoff coverage on first pass. $2.1M average change orders avoided per tower. $40B+ in active work priced on Pilars. Contractors report 68% faster bids and 40% more bids submitted monthly using AI-based estimating software.

Supported Trades — Trade-Specific Takeoff Software

Electrical takeoff software, plumbing quantity takeoff, drywall estimating, HVAC takeoff, concrete and rebar estimating, structural steel takeoff, roofing estimating, doors and windows, finishes, flooring, and millwork. Each trade uses AI-assisted takeoffs for automated quantity extraction from 2D drawings.

Free Takeoff Calculators with Excel Downloads

Pilars offers eight free construction takeoff calculators with downloadable, formula-driven Excel templates — no sign-up: a drywall takeoff calculator (metal studs, board, mud, tape), an HVAC takeoff calculator (tonnage, CFM, ductwork), an electrical takeoff calculator (devices, wire, conduit, breakers), a plumbing takeoff calculator (pipe, fittings, WSFU/DFU), a concrete takeoff calculator (yardage, forms, base), a rebar takeoff calculator (bar count, tonnage, laps), a door schedule and hardware calculator and a window takeoff calculator. See all at pilars.ai/takeoff-calculators.

Watch the Pilars launch film, The Next Step (2:01) or the product demo.

Pilars vs Togal.ai and Attentive.ai (Beam AI)

How is Pilars different from Togal.ai and Attentive.ai (Beam AI)? Pilars runs the takeoff automatically across 19 trades from one upload and returns it in minutes, and the estimator can still open any detection and change it. Togal.ai is an AI-assisted workspace sold at $299 per user per month; Attentive.ai sells Beam AI as annual per-trade licences from $8,000 or a done-for-you service with 24 to 72 hour turnaround. Pilars is $300 per user per month. On a published duplex-receptacle benchmark on one real power plan, Pilars scored 97.5%, Togal 84% and Attentive 65%. See Pilars vs Togal.ai, Pilars vs Attentive.ai, Togal vs Attentive.ai vs Pilars, the receptacle benchmark and all takeoff software comparisons.

Can I edit the takeoff Pilars produces? Yes. Pilars automates the first pass, then the estimator has the final say: open any detection, reclassify it, add or remove items, adjust a boundary or quantity, and the totals update. More: editable AI takeoff software.

See Pilars run a takeoff on your own plans. Book a call →