pilars
Westgate Medical · Tower 7 / Pre-construction / Intake
live · 4 agents
T C B P
← Home Finish
— no sheet selected —
drop files to begin
scanning

Drop your plan set

Pilars reads every sheet — plans, schedules, elevations, sections, specs, RFIs — and captures the entire document set into a structured project model.

.PDF · .DWG · .RVT · .IFC · UP TO 2,000 SHEETS
1 2 3 4 A B C PROJECT — WESTGATE MEDICAL / T7 SHEET A-201 · LEVEL 02 PLAN SCALE 1:100 · ISSUED 04 · 18 · 26 Level 02 — patient floor EXAM 201 — 412 SF VCT · GYP · ACT-1 NURSE STATION — 618 SF RUBBER · GYP · ACT-2 CONF 202 — 286 SF CARPET · GYP · ACT-1 LOBBY 200 412 SF · VCT SUPPLY 204 CORE / STAIR D-04 D-07 D-09 D-12 W-01 W-02 P1 P2 E1 E2 28' - 4" 32' - 0" 18' - 8" Door schedule — Level 02 MARK FROM → TO SIZE TYPE RATING HARDWARE REF D-04 Exam 201 → Corridor 3'–0" × 7'–0" HM-1 90 min HW-3 / closer A-201 D-05 Exam 203 → Corridor 3'–0" × 7'–0" HM-1 90 min HW-3 / closer A-201 D-07 Lobby → Corridor 3'–6" × 7'–0" WD-2 20 min HW-1 / push-pull A-201 D-09 Lobby → Stair / Egress 3'–0" × 7'–0" HM-1 90 min HW-5 / panic device A-201 D-12 Supply 204 → Corridor 3'–0" × 7'–0" WD-2 20 min HW-1 / push-pull A-201 D-14 Conf 202 → Corridor 3'–0" × 7'–0" WD-1 — HW-2 / lever A-201 D-16 Nurse Stn → Corridor 3'–6" × 7'–0" WD-2 20 min HW-4 / privacy A-201 7 OF 18 DOORS SHOWN · 11 ADDITIONAL ON LEVEL 02 HW-1 OFFICE · HW-2 MEETING · HW-3 EXAM · HW-4 PRIVACY · HW-5 PANIC Level 02 — lighting + power LP–2A 42-CKT 208V/3φ Sa Sb Sc Sd EXIT EXIT LEGEND 2×4 LED 4000K DUPLEX 20A SWITCH PANEL EXIT EGRESS CIRCUIT Level 02 — plumbing CW HW ST WC-1 WC-2 WC-3 WC-4 WC-5 L-1,2,3 L-4,5 EX-S1 EX-S2 JS-1 LEGEND COLD HOT SANITARY WC LAV FLR DRAIN

Takeoff — Level 02

Westgate Medical · Tower 7 · Rev 04 · Mapped from 18 sheets
Generated 12:48 · 4 agents
ItemSpec / sourceQtyUnitSubtotal
SF Captured
0sf
Items Quantified
0
Mapped References
0
Estimated Total
$0
Step 1 / 4 · Document intake
See Pilars run a takeoff on your own plans. Book a call →