Trade-Specific AI Takeoff Software

Pilars provides trade-specific AI takeoff software with dedicated models for each trade, because every trade reads a plan set differently. Automated quantity extraction across 48 CSI divisions at $100 per trade, per plan.

Trades Pilars supports

Why trade-specific takeoff matters

Electrical counts devices and conduit, plumbing traces pipe and fixtures, drywall measures wall area and board. Generic tools miss scope; Pilars uses dedicated trade models so quantities match how each trade bids.

Multi-Trade Estimating Platform

Every Trade,
One Platform

From electrical to HVAC, plumbing to concrete—Pilars delivers accurate, trade-specific estimates with specialized calculations for every discipline.

0
Trades Supported
0
Material Items
AI+QA
Human Verified
All Trades

Complete Trade Coverage

Specialized estimating tools and material databases for every construction discipline

Deep Dive Library

32 Long-Form Guides Per Trade

Every trade has a Takeoff Guide and Cost Estimating page — real waste factors, labor units, bidding traps, and 2026 pricing bands written for working estimators.

Drywall
Takeoff Guide
Board SF, stud LF, waste math — complete walkthrough.
Drywall
Cost Estimating
AWCI labor units, burden, 2026 pricing bands.
Electrical
Takeoff Guide
Device counts, conduit LF, NEC cross-references.
Electrical
Cost Estimating
NECA Column 2, copper pricing, service sizing.
HVAC
Takeoff Guide
SMACNA duct weight, equipment schedules, zones.
HVAC
Cost Estimating
MCAA rates, RTU pricing, refrigerant burden.
Plumbing
Takeoff Guide
Fixture units, DWV sizing, riser math.
Plumbing
Cost Estimating
Copper vs PEX pricing, fixture schedules.
Concrete
Takeoff Guide
Cubic yards, formwork, rebar weight, embeds.
Concrete
Cost Estimating
Mix design premiums, placement crew rates.
Structural Steel
Takeoff Guide
Tonnage, shop drawings, connections, bolts.
Structural Steel
Cost Estimating
AISC labor hours, erection crane burden.
Masonry
Takeoff Guide
CMU counts, brick math, mortar, ties.
Masonry
Cost Estimating
Crew productivity, scaffolding, winter burden.
Roofing
Takeoff Guide
Slope factors, square math, flashing LF.
Roofing
Cost Estimating
TPO, EPDM, modified bit — 2026 bands.
Painting
Takeoff Guide
Gallons, spread rate, surface prep SF.
Painting
Cost Estimating
PDCA rates, specialty coatings, prep time.
Carpentry
Takeoff Guide
Board feet, trim LF, casework LF, blocking.
Carpentry
Cost Estimating
Engineered lumber pricing, millwork markups.
Civil / Sitework
Takeoff Guide
Cut/fill, swell, utilities LF, paving SY.
Civil / Sitework
Cost Estimating
Equipment hours, haul-off, dewatering.
Glazing
Takeoff Guide
IGU SF, curtain wall, storefront LF.
Glazing
Cost Estimating
Low-E coatings, spec-drift traps.
Fire Protection
Takeoff Guide
NFPA 13 hazard classes, head spacing.
Fire Protection
Cost Estimating
Hydraulic calc labor, fire pump pricing.
Insulation
Takeoff Guide
R-values, board-foot spray foam math.
Insulation
Cost Estimating
Batt vs blown vs foam — apples to apples.
Flooring
Takeoff Guide
SF by product, waste by pattern, transitions.
Flooring
Cost Estimating
Subfloor prep burden, moisture mit.
Landscaping
Takeoff Guide
Paver math, irrigation zones, seeding rates.
Landscaping
Cost Estimating
Plant markup, maintenance contract math.

Ready to Estimate
Your Trade?

Start with a free estimate and see how Pilars handles your specific trade requirements.

See Pilars run a takeoff on your own plans. Book a call →