Pay per project takeoff software, and the other ways to skip the contract.
Most takeoff software is rented by the seat, by the year, whether you bid two jobs that month or twenty. There are five ways around a long commitment: pay by the job, buy a licence once, start on a free tier, hand the takeoff to a service, or rent month to month. This guide lists real products and prices for each, and shows at what bid volume each one stops making sense.
Is there pay per project takeoff software with no subscription?
Yes, though the list is short. Klorra AI lists $299 per bid for custom home builders, ConstructConnect Takeoff-as-a-Service is pay per project by quote, Active Takeoff is a one-time licence listed at $299, and STACK has a free version. Pilars is not pay per project: it is a flat $300 per user per month, one trade per user with unlimited takeoffs, billed monthly, so there is no annual contract and no per-project meter. A per-bid price like $299 costs more than that flat month from the second bid.
Disclosure first: Pilars publishes this page and is one of the products on it. Pilars is a monthly subscription, so if a true per-job price is what you need, the products to look at are the others in the table below.
Pricing reviewed 13 November 2026, based on public documentation as of Nov 2026. Active Takeoff pricing was last checked in September 2026. Klorra AI, ConstructConnect, Active Takeoff, STACK, Togal.AI, Beam AI, Kreo, PlanSwift and Exayard are trademarks of their owners; this is an independent comparison published by Pilars.
Pay as you go takeoff: the five pricing models compared
| Model | Example | Who reads the drawings | Platform | Public price | Commitment | Best for |
|---|---|---|---|---|---|---|
| Per project, software | Klorra AI | Klorra; a full bid comes back in about four hours | Web | $299 per bid, or $329 per month | None on the per-bid price | Custom home builders who bid now and then and want a priced bid, not only quantities |
| Per project, service | ConstructConnect Takeoff-as-a-Service | ConstructConnect | Service | Pricing is not public; you get a quote | "Pay per project, per trade, no annual contract" | Contractors who want to hand the takeoff off entirely |
| One-time licence | Active Takeoff | You | Windows | $299 single user; $999 for five users | None after purchase | Small shops that want to own a simple measuring tool |
| Free tier | STACK | You | Browser | Free version; paid plans "as low as $299 per user per month" | None on the free version | Trying cloud takeoff, or very occasional measuring |
| Month to month, metered | Exayard | The software, metered by credits | Web | $99 or $249 per user per month | Billed monthly | Small teams who accept a seat but not an annual term |
| Month to month, flat | Pilars | The software reads the set and spec book; the estimator reviews and edits | Browser | $300 per user per month, one trade per user, unlimited takeoffs | Monthly billing available; no annual contract required | Estimators bidding two or more jobs a month in one trade |
What "takeoff software, no subscription" can mean
People who search for takeoff software without an annual contract are usually after one of five things, and they are priced very differently.
True pay per project
You pay when there is a job and nothing when there is not. Klorra AI is the clearest published example: $299 per bid, with a full bid returned in about four hours. It is aimed at custom home builders, so a commercial electrical sub is not its customer. Klorra also sells a $329 monthly plan for builders who bid more often.
Takeoff as a service, by quote
ConstructConnect Takeoff-as-a-Service is described as "pay per project, per trade, no annual contract". Somebody else does the takeoff and sends it back. The catch for budgeting is that no price is published, so you cannot compare it to anything until you have a quote. Beam AI also offers done-for-you takeoffs with a 24 to 72 hour turnaround, but as an annual licence from $25,000, which is a commitment and not pay as you go.
One-time licence
Active Takeoff is a Windows desktop tool with a single-user licence listed at $299, bought once. Over five years nothing on this page costs less. What you own is a manual tool, though. You still click every count and trace every wall, so the saving is on software and not on hours. Whether PlanSwift still sells perpetual licences is something we could not confirm from the vendor; its pricing page now shows annual tiers at $2,000 and $3,000.
Free tier
STACK offers a free version of its takeoff and estimating product. A free tier is the lowest-risk way to find out whether you will use takeoff software at all, and for a shop that measures a few sheets a quarter it may be all that is needed. STACK's paid plans are listed "as low as $299 per user per month", and its pricing page does not state the billing term, so ask before you upgrade.
Month-to-month subscription
This is still a subscription, without the twelve-month lock-in. Exayard bills its $99 and $249 per user plans monthly, with AI usage metered by credits, so heavy use can cost more than the seat price. Pilars is $300 per user per month with one trade per user and unlimited takeoffs, and it can be billed monthly or annually.
For contrast, the best-known AI takeoff products are annual commitments. Togal.AI is $299 per user per month billed yearly. Kreo bills annually only. Beam AI sells annual licences from $8,000 per trade for its self-serve tier.
Per bid or flat monthly: a guide by bid volume
The fair way to compare a per-bid price with a flat month is to count your bids. Using the one published per-bid price, $299, against a flat $300 per user per month:
| Bids in a month | At $299 per bid | Flat $300 per user per month | Lower cost |
|---|---|---|---|
| 0 | $0 | $300 | Per bid |
| 1 | $299 | $300 | Level, within a dollar |
| 2 | $598 | $300 | Flat monthly |
| 4 | $1,196 | $300 | Flat monthly |
| 10 | $2,990 | $300 | Flat monthly |
So a per-bid price like $299 passes a $300 flat month from the second bid. Some cautions on reading that table:
- The two prices buy different things. Klorra's $299 returns a priced bid for a custom home. A Pilars user gets quantities for one trade on any number of plan sets. The table compares pricing models, not like-for-like products.
- Quiet months favour per bid. A builder who bids six jobs a year pays $1,794 at $299 a bid. Twelve months of a flat $300 subscription is $3,600. If your volume is that low, pay per project or a free tier is the right call.
- Trades multiply on Pilars. A Pilars user covers one trade. Two trades is two users at $600 a month, three users is $900 a month ($10,800 a year) and five users is $1,500 a month ($18,000 a year). A GC who wants many trades taken off should price it that way.
- Several options here cost less than Pilars. Active Takeoff at $299 once, STACK's free version and Exayard's $99 plan are all cheaper, and PlanSwift at $2,000 to $3,000 a year is cheaper per seat as well. They are tools the estimator drives by hand or pays for by the credit. The Pilars case is that the software does the first pass, not that it costs less.
- The licence is the small number. A manual commercial takeoff runs 40 to 80 hours. Whichever model you choose, the hours it saves or fails to save outweigh the difference in the table.
There is a wider price survey at takeoff software pricing.
Where Pilars sits: flat monthly, not pay per project
To be plain about it, Pilars does not sell takeoffs by the project. The price is $300 per user per month. Each user picks one trade and can run unlimited takeoffs in it, with no cap on projects, plan sets or sheets, and the price does not move with volume. Billing is monthly or annual, so no annual contract is required. Here is what that buys.
- Control when you want it. Pilars runs the takeoff automatically, but nothing is locked. Open any detection and change it: reclassify a wall type, add or remove a device, adjust a boundary or a quantity, and the totals update. The first pass is the software's and the final say is the estimator's.
- Speed. The plan set and spec book are read in minutes. Nobody draws or clicks the first pass, and there is no service queue. Beam AI's done-for-you tier, by comparison, quotes 24 to 72 hours.
- Benchmark-backed counting. In the one test we have published, duplex receptacle counts on one real power plan, Pilars scored 97.5%, Togal 84% and Attentive, the maker of Beam AI, 65%. That is one task on one sheet, not a general accuracy figure.
- 19 trades. Electrical, plumbing, HVAC, fire protection, drywall, concrete and the rest. Togal is architectural-first, and Beam AI's self-serve licence covers HVAC, plumbing and steel only.
- No meter. There are no credits and no per-project fee. An estimator who bids ten jobs in a month pays the same $300 as one who bids two.
There is no permanent free tier. Pilars will run a takeoff on your own drawings before you buy; start at the live demo, and pricing has the details.
Which model fits which shop
Pay per project, a licence or a free tier fits if
- You bid less than one job a month and a monthly fee would sit idle
- You build custom homes and want a priced bid back. Klorra AI at $299 per bid is aimed at you
- You want the takeoff done for you and are happy to ask for a quote each time. That is ConstructConnect Takeoff-as-a-Service
- You only need a simple measuring tool to own forever. Active Takeoff does that for $299
- You are not sure you need software yet. Start on STACK's free version
A month-to-month subscription fits if
- You bid two or more jobs most months, so a per-bid price would cost more
- You want a fixed bill you can budget, with no credits to watch
- You do not want to sign for twelve months before you know the tool works for you
- You want the first pass done by the software in minutes and the right to edit every detection. That is Pilars, at one trade per user
Best for: Klorra AI is the pick for custom home builders who bid occasionally. Active Takeoff is the pick if owning a manual tool is the whole goal. Pilars is the pick for a trade estimator bidding two or more jobs a month who wants an automated, editable first pass without an annual contract. Togal.AI is the pick for daily floor-plan takeoff volume across architectural scope, if a yearly term is acceptable.
Questions estimators actually ask
Is there AI takeoff software I can pay for per project instead of an annual seat?
Klorra AI lists $299 per bid for custom home builders, and ConstructConnect Takeoff-as-a-Service is pay per project but quote only. Pilars is not pay per project; Pilars is $300 per user per month with unlimited takeoffs and monthly billing, so it avoids an annual seat without charging by the job.
What takeoff software has no subscription?
Takeoff software with no subscription includes Active Takeoff, a Windows desktop tool sold as a one-time licence listed at $299 for a single user, Klorra AI at $299 per bid for custom home builders, and the free version of STACK. Pilars is a subscription at $300 per user per month, though it can be billed monthly.
Is Pilars pay per project?
Pilars is not pay per project. Pilars costs a flat $300 per user per month, each user covers one trade with unlimited takeoffs, and billing is monthly or annual, so there is no per-project fee and no annual contract is required.
At how many bids a month does a flat monthly subscription beat pay per bid?
A per-bid price of $299, which is what Klorra AI lists, costs more than a flat $300 per user per month from the second bid in a month: two bids are $598 against $300. At one bid a month the two are level, and below that pay per bid is cheaper.
Which takeoff software can I use without an annual contract?
Takeoff software without an annual contract includes Exayard at $99 or $249 per user billed monthly, Pilars at $300 per user per month with monthly billing, Klorra AI at $299 per bid, and Active Takeoff as a one-time $299 licence. Togal.AI and Kreo are billed annually.
What is the difference between Pilars and ConstructConnect Takeoff-as-a-Service?
Pilars is software that reads the plan set and returns editable quantities in minutes for a published $300 per user per month with unlimited takeoffs in one trade. ConstructConnect Takeoff-as-a-Service is a takeoff service described as pay per project, per trade, with no annual contract, and its pricing is not public.
Does Pilars have a free tier or a minimum commitment?
Pilars has no permanent free tier. Pilars is $300 per user per month and can be billed monthly, so there is no annual commitment, and Pilars will run a takeoff on your own drawings as a demo before you buy.