Takeoff calculators for every trade.

Sixteen free calculators that turn quantities you already know into material lists, pipe and wire sizes, and ROI numbers — and export them as proper Excel takeoff templates with live formulas. No sign-up.

Drywall

Drywall takeoff calculator

Wall lengths → metal studs, track, board, screws, joint compound, tape and corner bead.

→
HVAC

HVAC takeoff calculator

Room areas → tonnage, CFM, trunk and flex duct, diffusers, grilles, dampers and sealant.

→
Electrical

Electrical takeoff calculator

Device counts → boxes, wire or conduit, breakers, panel size, plates and low-voltage drops.

→
Plumbing

Plumbing takeoff calculator

Fixture counts → supply and DWV pipe by size, fittings, stops, traps, hangers, WSFU/DFU.

→
Concrete

Concrete takeoff calculator

Slabs, footings and walls → yardage, trucks, gravel base, vapor barrier, forms and finishing.

→
Rebar

Rebar takeoff calculator

Mat dimensions and spacing → bar count, lengths with laps, tonnage, tie wire and chairs.

→
Doors

Door schedule & hardware calculator

Pick the door type → full hardware set per opening: hinges, locksets, closers, stops, seals.

→
Windows

Window takeoff calculator

Pick the window type and size → operating hardware, screens, flashing, foam and casing.

→
Framing

Framing calculator

Wall lengths → studs, plates, headers, sheathing, board feet and nails.

→
Painting

Paint coverage calculator

Room perimeters → gallons by coats, primer, tape, rollers and supplies.

→
Masonry

Concrete block (CMU) calculator

Wall dimensions → block count, mortar bags, grout yardage and rebar.

→
Electrical · NEC

Conduit fill calculator

Wires + conduit → fill % pass/fail and the smallest size that works.

→
Electrical · NEC

Wire size calculator

Load amps + length → minimum AWG by ampacity with voltage-drop upsize.

→
Electrical · NEC

Voltage drop calculator

Wire, length and load → VD volts and %, against 3%/5% guidance.

→
Plumbing

Water pipe sizing calculator

Fixture units or GPM → pipe size for copper, PEX and CPVC.

→
ROI

Takeoff ROI calculator

Your bid volume → hours and dollars manual takeoffs cost you each month.

→

Calculators price what you can count. Pilars reads what you can’t.

Every tool on this page works from quantities you type in — which means quantities you already measured. The expensive mistakes live in the drawings: the wall-type legend, the finish schedule, the panel schedule, the riser diagram, the hardware sets buried in the spec book. Pilars AI takeoff reads the full plan set and returns bid-grade quantities by assembly — $100 per trade, per plan, unlimited projects.

Questions contractors actually ask

Are these takeoff calculators really free?

Yes — all sixteen, no sign-up. Enter your quantities, see the material list instantly, download the Excel. Pilars makes money on AI plan takeoffs ($100 per trade), not on calculators.

What do the Excel downloads contain?

A real .xlsx workbook with an input sheet and a materials sheet. The cells carry live Excel formulas, so you can change quantities, spacing or waste factors inside Excel and everything recalculates. Blank reusable templates are included too.

Which trades are covered?

Drywall, HVAC, electrical, plumbing, concrete, rebar, door hardware and windows — each with its own trade-specific factors, all documented on the page.

How accurate are calculator-based takeoffs?

They use standard industry estimating factors — good for budgets and quick material orders. For bid-grade takeoffs from actual plans, Pilars AI reads the full set for $100 per trade.

See Pilars run a takeoff on your own plans. Book a call →