Resources / Templates / Invoice builder
Contractor template

Drywall invoice builder

Fill in your company, customer, and scope. Print a clean invoice. CSV export included.

Invoice data inputs

Description
Qty
Unit
Rate
Download CSV
Ironwood Drywall & Acoustical, Inc.

INVOICE

Invoice #2026-0418
Issue date
Apr 15, 2026
Due date
May 15, 2026
PO reference
PO-24488
Project
Osprey Office Tower
Bill to
Mark Sanford
From
Ironwood Drywall
#DescriptionQtyUnitRateAmount
Subtotal$0.00
Discount-$0.00
Tax (0%)$0.00
Total due$0.00
Deposit received-$0.00
Balance due$0.00
Notes & terms
License: ROC #318224 KA-06 EIN: 82-3451229 ironwooddrywall.com
How to use & print tips

Field notes

  • Initials — 2 or 3 letters used for the logo mark (orange gradient circle).
  • Invoice # — your own numbering. Suggested format: YYYY-NNNN.
  • PO reference — GC or owner PO tied to this invoice.
  • Unit — sf, lf, ea, hr, ls. Use ls (lump sum) for punch and misc.
  • Tax rate — many service trades invoice 0%. Check your state's contractor classification.
  • Deposit — subtracted from Total due to get Balance due.

Math

  • Line amount = qty × rate
  • Subtotal = sum of all line amounts
  • Taxable = max(subtotal − discount, 0)
  • Tax = taxable × (tax_rate / 100)
  • Total due = taxable + tax
  • Balance due = total due − deposit

Print tips

  • Click Print / Save as PDF. Your browser's print dialog opens. Choose Save as PDF as the destination for a file.
  • Page size is US letter, 0.5" margins. The form and navigation are hidden on print.
  • Chrome and Safari both honor the print stylesheet. In Firefox, set Scale to 100% if content looks cut off.
  • Print in color for the orange accent, or Black & white for plain invoices.

CSV export

  • Exports a flat CSV with all field values and line items, so you can paste into QuickBooks / Sage / a spreadsheet.
See Pilars run a takeoff on your own plans. Book a call →