Resources / Drywall tools / Mud & tape
Finish material

Joint compound & tape calculator

Area and finish level in. Tape LF, ready-mix gallons, buckets, hot mud, and material dollars out. Bazooka discount toggle.

Area & finish inputs

Enter the net drywall area you're finishing. Use the sheet calculator for net area.
Per GA-214. L1 fire-tape, L2 garage/service, L3 standard texture, L4 smooth/eggshell, L5 skim-coat critical light.
Automatic tools reduce tape waste by ~8%.
Skim coat uses L5 rates. At L5 this is always on.

Pricing optional

Typical 5-gal bucket lists at $55–$95 ($11–$19/gal).
Paper tape 500 LF; fiber mesh is usually a touch higher.
Used for L4/L5 first coat; applied at ~20% of total compound.
Download CSV
Drywall tape
0
Linear ft
Tape rolls
0
500-ft rolls
Ready-mix mud
0
Gallons
5-gal buckets
0
Buckets
Setting (hot) mud
0
Gallons
Material cost
0
USD
Show methodology & assumptions

Rate table

FinishTape LF / 1,000 sfMud gal / sf
L1 fire-tape2200.018
L22800.030
L33700.053
L44000.065
L5 (skim)4000.090

Formulas

  • Tape LF = area × tape_rate / 1000 × tool_factor (tool_factor = 0.92 for bazooka, 1.00 manual)
  • Tape rolls = ceil(tape_LF / 500)
  • Mud gal = area × gal_rate (L5 used whenever skim checkbox is on)
  • Buckets = ceil(mud_gal / 5)
  • Setting compound = 0.20 × mud_gal for L4 & L5, else 0
  • Cost = rolls × $roll + mud_gal × $gal + hot_gal × $hot

Sources

  • GA-214 Recommended Levels of Gypsum Board Finish.
  • USG / NGC / CertainTeed published coverage charts.
  • TapeTech / Columbia bazooka waste ranges (6–10% savings typical).
See Pilars run a takeoff on your own plans. Book a call →