Pilars vs Togal.AI.
Both products use AI to take quantities off drawings, and both run in a browser. They also cost about the same per seat, so price will not settle this one. What separates them is who produces the first pass, how fast it arrives, which trades it covers, and what a single seat includes. This page takes each in turn and says plainly where Togal is the smarter purchase.
Pilars vs Togal.AI: which one should you buy?
Pilars and Togal.AI cost about the same per seat: Togal.AI is $299 per user per month billed yearly ($3,588 a year), and Pilars is $300 per user per month ($3,600 a year), with monthly billing available. The difference is in the product. Pilars runs the takeoff automatically from the plan set and spec book in minutes, keeps every detection editable, and covers 19 trades including electrical, plumbing, HVAC and fire protection; each Pilars user covers one trade with unlimited takeoffs. Togal.AI is an architectural-first AI takeoff workspace whose seat is not sold per trade, which suits general contractors who quantify many scopes on every set.
| Pilars | Togal.AI | |
|---|---|---|
| What it is | Automated AI takeoff with code-compliance flags; every detection is editable | AI-assisted takeoff workspace: auto detect, measure and count, plan search, drawing comparison |
| Who reads the drawings | The software reads every sheet and the spec book; the estimator reviews and corrects | The estimator runs the AI tools in the workspace and organizes the results |
| Trades | 19 trades from one upload, including electrical, plumbing, HVAC and fire protection | Vendor lists GC, painting, drywall, framing, flooring, glazing, doors and hardware, electrical |
| Platform | Browser, any operating system | Browser, cloud-based |
| Pricing model | Per user. Each user includes one trade, with unlimited takeoffs. Monthly or annual billing | Per user, annual billing. The seat is not sold per trade |
| Public price | $300 per user per month ($3,600 per user per year) | Growth: $299 per user per month billed yearly ($3,588 per user per year). Business (4+ users): custom |
| Estimating database | No. Quantities export to your own estimate | No. Takeoff only |
| Best for | Trade subcontractors and precon teams who want an editable first pass in minutes, MEP above all | GCs and interior trades who take off several scopes per set from one seat |
Pricing reviewed 13 November 2026, based on public documentation as of Nov 2026. Togal.AI is a trademark of its owner; this is an independent comparison written by Pilars. Confirm current terms with each vendor before you buy.
Control: an automatic first pass that you can overrule
Estimators are right to be wary of a tool that hands over a number and asks for trust. Pilars runs the takeoff on its own, and then nothing is locked. Open any detection and change it: reclassify a partition the architect tagged two different ways, add the floor box the model missed, delete a device that sits in a detail rather than on the plan, pull an area boundary back to the right grid line, or overwrite a quantity. The totals update as you go. Each quantity arrives confidence-scored and sourced to its sheet, so you know where to spend your review time first.
Togal gives the estimator control from the other direction. You work in the drawing from the start: run the AI on the sheets you choose, search the set for an image or a symbol, compare drawing versions, and build up your scopes as you go. Estimators who think by measuring often prefer that, and it is a real strength of the product.
Both tools leave the final say with the estimator. In Togal some of your hours go into producing and organizing the first pass. In Pilars they start at checking it.
Speed: minutes to a first pass
Pilars reads the full PDF set and the spec book in minutes, resolving cross-sheet references and the door, window, fixture and equipment schedules along the way. Nobody draws or clicks the first pass, and there is no queue or service turnaround to wait on.
Togal is also fast compared with tracing by hand, and its seat includes unlimited automated takeoffs, as a Pilars user does. The time that remains is operator time: choosing sheets, running detection, grouping results and cleaning up. Third-party listings report that some G2 reviewers mention manual clean-up of AI results, rework on Excel exports and slowdowns at peak times, on a product those same listings report at about 4.8 out of 5 across roughly 60 reviews.
Accuracy: one published test, stated narrowly
Togal does not publish an accuracy figure on its current site, so there is no vendor number to quote for it. Pilars has published one benchmark: on a single real power plan, counting duplex receptacles, the Pilars fine-tuned model scored 97.5%, Togal scored 84% and Attentive (the maker of Beam AI) scored 65%. The method and the sheet are on the duplex receptacle benchmark page.
That is one device type on one drawing, run by Pilars. It is not a claim about overall accuracy, and it says nothing about room areas on an architectural plan, the work Togal is best known for.
Trades: 19 from one upload versus an architectural-first tool
Togal earned its reputation on floor plans: detecting, measuring and labelling spaces. Its site lists general contractors, painting, drywall, framing, flooring, glazing, doors and hardware, and electrical.
Pilars covers 19 trades from the same upload: electrical, plumbing, HVAC, fire protection, drywall, framing, painting, flooring, finishes, millwork, glazing, doors and windows, insulation, concrete, rebar, structural steel, masonry, roofing and earthwork. The MEP trades depend on reading panel and fixture schedules and following a run from sheet to sheet. Pilars also flags code-compliance issues against IBC, NEC, IPC, IMC, ADA and NFPA as part of the takeoff, which Togal's public pages do not describe.
Price: the same per seat, counted differently
Togal's public Growth plan is $299 per user per month billed yearly, which is $3,588 per user per year. Pilars is $300 per user per month, or $3,600 over a year, and can be billed monthly or annually. Twelve dollars a year is not a reason to pick either one. Both include unlimited takeoffs, so neither bill moves with the number of sets you bid.
What differs is what a seat covers. A Pilars user includes one trade of their choice. A Togal seat is not sold per trade. That changes the count as soon as one person takes off more than one trade.
| Shop | Togal.AI per year | Pilars per year |
|---|---|---|
| Electrical sub, 1 estimator, one trade | 1 seat: $3,588 | 1 user: $300 a month, $3,600 |
| Electrical contractor, 3 estimators, all on electrical | 3 x $3,588 = $10,764 | 3 users: $900 a month, $10,800 |
| Mechanical sub, 1 estimator covering plumbing and HVAC | 1 seat: $3,588 | 2 users (one per trade): $600 a month, $7,200 |
| GC precon team taking off five trades | Custom quote (Business plan, 4+ users); seats are not tied to trades | 5 users (one per trade): $1,500 a month, $18,000 |
In the first two rows the two products cost the same, and the decision comes down to the sections above. The last two rows favour Togal on price. A general contractor who quantifies most of the building needs a Pilars user for every trade, while a few Togal seats can be pointed at any scope. If that is your shop, weigh the extra Pilars users against the hours an automated first pass saves on each of those trades.
The other difference is the commitment. Togal's public plan is billed a year at a time. Pilars offers monthly billing, and users can be added or changed at any time. The full breakdown is on the Pilars pricing page.
When Togal.AI is the better choice
- You are a GC quantifying most of the building. A Togal seat is not tied to a trade, so one estimator can take off six scopes on one licence. Pilars needs a user for each trade.
- Your work is mostly area and linear off floor plans. Flooring, paint, drywall and ceilings are the scopes Togal was built around.
- You want to live in the drawing. If an interactive workspace with plan search and version comparison open all day is how you estimate, Togal is that product.
- Outside reviewers need to see your takeoff. Togal states that external collaborators do not need an account.
Shops already on eTakeoff Dimension have one more route: Togal is sold there as an add-on at $1,800 per user per year.
And when Pilars is
- Each estimator works one trade. A Pilars user then costs the same as a Togal seat, and the first pass is already done when the estimator opens the job.
- Your trade is MEP, fire protection or structural. Counts, runs and schedule reconciliation are where an automated first pass saves the most hours.
- The spec book changes your quantities. Pilars reads the specifications with the drawings.
- You do not want to pay a year up front. Pilars can be billed monthly; Togal's public plan is billed yearly.
How to test both on the same bid
Pick a set you have already taken off by hand, so you know the right answers. Ask Togal for a demo on it and run the same PDF through the Pilars demo. Pilars has no free tier, but the demo on your own plans costs nothing. Score three things: how many known quantities each tool matched before correction, how long it took from upload to a number you would sign, and how easy it was to fix what was wrong. Every AI takeoff has errors, so the third matters most. If you are replacing Togal outright, see the Togal alternative page.
Questions estimators actually ask
Is Pilars better than Togal.AI?
Pilars is the better fit for trade subcontractors, MEP especially, who want an automated first pass in minutes that they can still edit line by line. Togal.AI is the better fit for general contractors and interior trades who take off many scopes per set, because a Togal.AI seat is not sold per trade while each Pilars user covers one trade. The two cost about the same per seat.
How does Pilars compare to Togal.AI on price and trades covered?
Pilars costs $300 per user per month, with one trade per user and unlimited takeoffs, and covers 19 trades including electrical, plumbing, HVAC and fire protection. Togal.AI costs $299 per user per month billed yearly on its public Growth plan and lists GC, painting, drywall, framing, flooring, glazing, doors and hardware, and electrical.
If Pilars runs the takeoff automatically, can I still change the results?
Yes. Pilars produces the first pass automatically, and the estimator can open any detection to reclassify it, add or remove an item, adjust a boundary or change a quantity, with totals updating. Togal.AI also leaves the estimator in control, working in the drawing from the start.
Which is cheaper for a three-estimator shop, Pilars or Togal?
Neither is meaningfully cheaper. Three Togal.AI Growth seats cost $10,764 a year, billed yearly, and three Pilars users cost $900 a month, or $10,800 a year. Each Pilars user covers one trade and can be billed monthly, while a Togal.AI seat is not limited to one trade.
Is Pilars more accurate than Togal.AI?
In the one benchmark Pilars has published, counting duplex receptacles on a single real power plan, Pilars scored 97.5% and Togal.AI scored 84%. Togal.AI does not publish an accuracy figure on its current site, and one test does not settle accuracy across all trades, so run both on a set you have already counted.
Does Togal.AI or Pilars have a free trial?
Togal.AI does not mention a free trial on its pricing page as of November 2026; its Try Now button leads to a demo booking. Pilars has no free tier either, but Pilars will run a takeoff on your own drawings as a free demo before you buy.
Do Togal.AI and Pilars work on a Mac, and does either include estimating?
Togal.AI and Pilars are both browser-based, so both work on macOS. Neither includes an estimating database: Togal.AI is takeoff only, and Pilars returns a takeoff summary and BOQ or Excel export to price in your own estimate.