— PlanSwift vs On-Screen Takeoff

PlanSwift vs On-Screen Takeoff.

Same parent company, same new AI layer, two very different habits of work. One prices the job as you measure and publishes what it costs. The other is the interior trades' long-time measuring tool and makes you ask for a quote.

PlanSwift vs On-Screen Takeoff: which one should you buy?

PlanSwift and On-Screen Takeoff are both Windows desktop takeoff programs owned by ConstructConnect, and both now include Takeoff BOOST AI. PlanSwift costs $2,000 per seat per year (Essential) or $3,000 (Core) and builds the estimate from assemblies as you measure. On-Screen Takeoff pricing is not public; you get a quote, and you add Quick Bid if you want the estimate. Pick PlanSwift for residential and light commercial work priced from assemblies, and On-Screen Takeoff for commercial interiors such as drywall, ceilings, paint and flooring.

People often ask this as if one of the two were about to be retired. Neither is. ConstructConnect sells both, put its new AI into both this year, and keeps them apart because the people who use them work differently. The difference between PlanSwift and On-Screen Takeoff is less about measuring tools, which overlap heavily, and more about what happens to a quantity once you have it.

Pricing reviewed 13 November 2026, based on public documentation as of Nov 2026. PlanSwift, On-Screen Takeoff, Quick Bid and Takeoff BOOST are trademarks of their owner; this is an independent comparison and Pilars is not affiliated with ConstructConnect.

Side by side

PlanSwiftOn-Screen Takeoff
What it isDesktop takeoff plus estimating with trade assembliesDesktop takeoff only; pairs with Quick Bid for the estimate
VendorConstructConnectConstructConnect (originally On Center Software, first released 1988)
Who reads the drawingsYou do. Takeoff BOOST offers Auto Count and Auto Scale on Essential, Auto Takeoff on CoreYou do. Takeoff BOOST offers auto count of repeating items, Auto Name and wall-type detection
Platform64-bit Windows only; a Mac needs Boot Camp or a Windows virtual machineWindows desktop
Pricing modelPer seat, annualPer seat, quote only
Public priceEssential $2,000 per year, Core $3,000 per year, one seat eachPricing is not public; you get a quote
Free trial14 days, no card14 days
Best forResidential and light commercial estimators who price from assemblies or ExcelCommercial interior subs: drywall, ceilings, paint, flooring

One thing the table hides: neither program takes the drawings off your desk. Takeoff BOOST gives a first pass on some items, and an estimator still sets conditions, checks what the AI found and measures the rest.

Where PlanSwift is the better pick

PlanSwift treats a takeoff item as the start of an estimate. You drag an assembly onto a wall, and the line you trace becomes studs, plates, board, fasteners and labor, each with your own unit cost behind it. If your shop has spent years tuning those assemblies, that library is the product. PlanSwift also has strong Excel integration, so a shop whose bid lives in a workbook can keep that workbook.

The second reason is plain: you can see the price. Essential is $2,000 per year for one seat and includes Auto Count, Auto Scale, Auto Bookmark and two hours of one-on-one training. Core is $3,000 per year and adds Auto Takeoff, which is the full Takeoff BOOST set. ConstructConnect lists discounts for extra seats and volume pricing at ten or more licenses. A small builder can decide in an afternoon without a sales call.

The fit is strongest for residential and light commercial work, where one person measures and prices the whole job. Review sites are directional at best, but PlanSwift holds about 4.3 on Capterra across roughly 396 reviews, and the recurring complaints in third-party reviews are the learning curve, licensing glitches and support response.

Where On-Screen Takeoff is the better pick

On-Screen Takeoff has been the default in commercial interiors for a very long time, and the reason is its condition-based workflow. Multi-Condition Takeoff, which is patented, lets one pass along a partition book several conditions together, so the wall, the base and the ceiling perimeter do not each need their own trip around the room. Typical areas let you take off a repeated unit or floor once and apply it across the building. Overlays show what moved between addenda.

Take a drywall sub bidding a four-story medical office building with a dozen wall types. That estimator is not short of a pricing database; the shop already has Quick Bid or its own system. What that estimator needs is to get through 60 sheets of partitions without retracing anything. That is the job On-Screen Takeoff was built around, and it is why a commercial drywall sub will usually be happier there than in PlanSwift.

What you give up is transparency and scope. On-Screen Takeoff pricing is not public, so budgeting means a conversation with sales. And the program stops at quantities: the estimate is a second product. ConstructConnect cites a G2 rating of 4.4 out of 5 from 148 reviews.

Takeoff BOOST in both: what the AI changes

ConstructConnect announced Takeoff BOOST on 22 April 2026. It shipped first in On-Screen Takeoff and was announced as coming to PlanSwift, where it now appears on the pricing page. So the old shorthand that both are purely manual tools is out of date.

The details differ by product. In On-Screen Takeoff the published features are auto count of repeating items, Auto Name for sheets and wall-type detection. In PlanSwift the split is by tier: Auto Count, Auto Scale and Auto Bookmark come with Essential, and the fuller Auto Takeoff needs Core at $3,000. If the AI is why you are buying PlanSwift, price Core, not Essential.

Treat these as assists inside a manual program. They shorten the counting and setup. They do not read a specification, reconcile a door schedule against the plan, or hand you a finished quantity list. Use the 14-day trial on a job you have already bid, so you know the right answer before the software gives you one.

Cost for a real shop, and the Mac question

For three estimators, PlanSwift Essential comes to no more than $6,000 per year and Core to no more than $9,000, before whatever multi-seat discount you negotiate. There is no matching number for On-Screen Takeoff because none is published. Ask for the quote in writing with the seat count, the term and whether Quick Bid is included, then compare.

Third-party reporting says On-Screen Takeoff licensing is moving from license keys and server codes to email-and-password subscriptions during 2026. If you run older keyed licenses, ask your rep how that affects you. On-Screen Takeoff has not been discontinued.

Neither program runs natively on a Mac. PlanSwift's own system requirements say it cannot be installed directly on a Mac and needs Boot Camp or a Windows virtual machine. ConstructConnect's answer for Mac users is a third product, ConstructConnect Takeoff, which runs in a browser and carries the same BOOST AI; its pricing is also not public. More on this in PlanSwift for Mac and takeoff software for Mac.

Best for: PlanSwift

One- to five-person residential and light commercial shops on Windows that want takeoff and estimate in one program at a published price.

Best for: On-Screen Takeoff

Commercial interior subs with heavy linear and area takeoff, an existing Quick Bid setup, and estimators who already think in conditions.

If you would rather not click at all

Both programs assume an estimator drives. Pilars works the other way round: you upload the plan set and the spec book, the software reads them together, resolves the schedules and cross-sheet references, counts and measures, and returns quantities with a confidence score and a sheet reference on each one. The estimator's job becomes review.

It runs in a browser, so Windows versus Mac stops mattering. The price is $300 per user per month, billed monthly or annually, and each user covers one trade of their choice with unlimited takeoffs, so the bill does not move with the number of plan sets you run. That is $3,600 a year, more than a PlanSwift Essential or Core seat, so the case for Pilars is not the price. It is that the software does the first pass and the estimator corrects it: any detection can be opened and changed, and the totals update. Nineteen trades are covered, including drywall, painting, flooring and framing, and a shop that wants two of them needs two users. On counting accuracy we publish our own test, a duplex receptacle benchmark on a real power plan where the Pilars model scored 97.5%.

Pilars is not an assembly library or a Quick Bid replacement. If your pricing lives in PlanSwift assemblies, the sensible setup is to keep one seat for pricing and let the automated takeoff feed it. You can run your own set through the live demo first.

Questions estimators actually ask

Is PlanSwift or On-Screen Takeoff better for a commercial drywall subcontractor?

On-Screen Takeoff is usually the better fit for a commercial drywall subcontractor because Multi-Condition Takeoff and typical areas are built for long runs of partitions and repeated floors. PlanSwift suits a drywall shop that wants assemblies to price the wall as it is measured in the same program.

What is the difference between PlanSwift and On-Screen Takeoff?

PlanSwift is takeoff plus estimating with drag-and-drop assemblies and published pricing of $2,000 or $3,000 per seat per year. On-Screen Takeoff is takeoff only, pairs with Quick Bid for the estimate, and is sold by quote. Both are Windows desktop programs from ConstructConnect.

Are PlanSwift and On-Screen Takeoff made by the same company?

Yes. ConstructConnect owns both PlanSwift and On-Screen Takeoff, and it also sells a browser product called ConstructConnect Takeoff. On-Screen Takeoff was originally built by On Center Software and first released in 1988.

Which is cheaper for a three-estimator shop, PlanSwift or On-Screen Takeoff?

PlanSwift lists $2,000 per seat per year for Essential and $3,000 for Core, so three seats cost at most $6,000 or $9,000 before multi-seat discounts. On-Screen Takeoff pricing is not public, so the only way to compare is to request a three-seat quote from ConstructConnect.

Do PlanSwift and On-Screen Takeoff both have AI now?

Yes. Takeoff BOOST AI was announced in April 2026 and is in both. On-Screen Takeoff gets auto count of repeating items, Auto Name and wall-type detection; PlanSwift Essential includes Auto Count and Auto Scale, and PlanSwift Core adds Auto Takeoff.

Can I run PlanSwift or On-Screen Takeoff on a Mac?

Not natively. PlanSwift requires 64-bit Windows and its documentation says a Mac needs Boot Camp or a Windows virtual machine, and On-Screen Takeoff is a Windows desktop program. ConstructConnect Takeoff is the browser option from the same vendor.

Is there an option where I do not have to do the takeoff myself in PlanSwift or On-Screen Takeoff?

Pilars is an automated alternative: it reads the plan set and spec book and returns quantities for an estimator to review and edit. Pilars is browser-based and costs $300 per user per month, with one trade per user and unlimited takeoffs, which is more per year than a PlanSwift seat.

See Pilars run a takeoff on your own plans. Book a call →