— PlanSwift alternatives, 2026

The best PlanSwift alternatives in 2026.

PlanSwift changed in 2026: two named tiers at $2,000 and $3,000 a year, AI tools bolted on, and still no way to run it on a Mac without Windows. If that has you looking around, here are eight PlanSwift competitors, what each one publishes for a price, and the cases where staying put is the right call.

Best PlanSwift alternatives in 2026: the short answer

The best PlanSwift alternatives in 2026 are Pilars, STACK, On-Screen Takeoff, ConstructConnect Takeoff, Bluebeam Revu, Togal.ai, Kreo and eTakeoff Dimension. PlanSwift costs $2,000 (Essential) or $3,000 (Core) per seat per year and runs on Windows only. Pilars costs $300 per user per month (one trade per user, unlimited takeoffs) and runs in any browser, Bluebeam Revu starts at $260 per user per year, eTakeoff at $795, Kreo at $100 per user per month, and STACK has a free version. For a Mac, pick a browser tool: Pilars, STACK, Kreo, Togal.ai or ConstructConnect Takeoff.

Most people searching for software like PlanSwift want one of three things: something that runs on a Mac, something cheaper per seat, or something that does more of the measuring. Those lead to different tools, and Pilars answers the first and the third but not the second: it costs more per seat than PlanSwift. For the current tiers in detail, see PlanSwift pricing.

Pricing reviewed 13 November 2026, based on public documentation as of Nov 2026. PlanSwift, On-Screen Takeoff, ConstructConnect, STACK, Bluebeam, Togal.ai, Kreo and eTakeoff are trademarks of their owners; this is an independent comparison.

PlanSwift competitors compared

ProductBest forTypePlatformPublic price
PlanSwift (the baseline)Windows estimators with tuned assemblies and Excel linksManual desktop takeoff plus estimating, AI toolsWindows only$2,000 or $3,000 per seat per year
PilarsShops that want the takeoff done automatically, then edited, on any computerAutomated AI takeoff; you review and editBrowser$300 per user per month; one trade per user, unlimited takeoffs
STACKThe closest cloud equivalent to PlanSwift's takeoff plus estimateManual cloud takeoff plus estimating, AI add-onsBrowserAs low as $299 per user per month; free version
On-Screen TakeoffCommercial interior subs who want the other desktop standardManual desktop takeoff, AI toolsWindows desktopPricing is not public; you get a quote
ConstructConnect TakeoffPlanSwift users who need a Mac or browser option from the same vendorAI-assisted cloud takeoffBrowser, Mac or WindowsPricing is not public; you get a quote
Bluebeam RevuLight takeoff alongside drawing markup, at the lowest seat pricePDF markup with manual measurementWindows desktop, web, mobile$260, $330, $440 or $590 per user per year
Togal.aiGCs and interior trades who want AI to measure floor plansAI-assisted takeoff onlyBrowser$299 per user per month, billed yearly
KreoEstimators who want browser takeoff plus estimating with published pricesAI-assisted takeoff plus estimatingBrowser$100, $175 (AI) or $250 per user per month, annual billing
eTakeoff DimensionSage Estimating users and anyone after a cheaper desktop seatManual desktop takeoffWindows desktop$795 or $1,495 per user per year

How these were judged. Five criteria: who reads the drawings (you or the software), trade fit, platform including Mac, whether the vendor publishes a price, and review signals from Capterra and G2. Prices were read on each vendor's pricing page on 13 November 2026; ratings come from third-party listings. Disclosure: Pilars publishes this page and is one of the products on it.

When PlanSwift is still the right tool

PlanSwift has plenty going for it. Drag-and-drop assemblies turn one traced wall or slab into a full list of material and labor lines, and the Excel integration is strong. If you have years of assemblies tuned to how your crews build, that library is worth more than the licence fee.

The 2026 pricing also moved AI into the product. Essential at $2,000 includes Auto Count, Auto Scale and two hours of one-on-one training; Core at $3,000 adds Auto Takeoff, the full Takeoff BOOST. There is a 14-day free trial with no card. Third-party listings report a Capterra rating of 4.3 from about 396 reviews, with complaints about the learning curve, licensing glitches and support. A single-seat Windows shop that bids every week and likes its assemblies has little reason to leave.

The eight PlanSwift alternatives

1. Pilars

Pilars replaces the clicking rather than the program around it. Upload the plan set and it reads every sheet with the spec book in minutes, resolves schedules and cross-sheet references, counts, measures and returns confidence-scored quantities sourced to the sheet. The first pass is automatic but nothing is locked: open any detection, reclassify a wall type, add or remove a device, adjust a boundary or a quantity, and the totals update, so the estimator keeps the final say. It covers 19 trades from one upload and runs in a browser on Windows, Mac or Chromebook. The price is $300 per user per month, $3,600 a year, billed monthly or annually; each user covers one trade with unlimited takeoffs. That is more than PlanSwift Essential at $2,000 or Core at $3,000, and a PlanSwift seat is not tied to one trade, so Pilars is first on this list for automation, not cost. On one published duplex receptacle benchmark it counted 97.5% correctly; that is a single test. Pilars has no PlanSwift-style assemblies; you export quantities to Excel and price them in your own system. Best for: shops where estimator hours, not software cost, limit how many jobs get bid. Details at Pilars vs PlanSwift.

2. STACK

STACK is the nearest thing to PlanSwift in a browser: manual on-screen takeoff with estimating and proposals in the same product. It has a free version, and paid plans are advertised from "as low as $299 per user per month", which is more than PlanSwift per seat. AI features exist, but Floor Plan AI is a paid add-on with no published price. Best for: teams that want PlanSwift's takeoff-plus-estimate workflow without Windows. See STACK vs PlanSwift.

3. On-Screen Takeoff

The other long-time desktop standard, from the same parent company. On-Screen Takeoff is strongest in interiors (drywall, ceilings, paint, flooring) and got Takeoff BOOST AI first in 2026. It is takeoff only; estimating means adding Quick Bid. Pricing is not public; you get a quote, and there is a 14-day trial. Best for: commercial interior subs. See PlanSwift vs On-Screen Takeoff.

4. ConstructConnect Takeoff

ConstructConnect's new browser product "runs right in your browser on Mac or Windows" with Takeoff BOOST AI for linear, area and count items. It has no built-in estimating. Pricing is not public; you get a quote. Best for: PlanSwift users who want to stay with the same vendor and get off Windows.

5. Bluebeam Revu

Revu is a PDF markup tool with measurement, not a dedicated takeoff product, and it is the cheapest seat here. Per Bluebeam's plan list, Basics ($260) measures length and area only, Core ($330) adds count, perimeter and volume, and Complete ($440) adds Quantity Link to Excel. There are no assemblies. Best for: contractors whose takeoffs are simple and who already live in Bluebeam. See Bluebeam vs PlanSwift.

6. Togal.ai

Togal is AI-assisted takeoff in a browser, strongest at detecting and measuring spaces on architectural plans, at $299 per user per month billed yearly ($3,588). It is takeoff only, with no estimating database. Best for: GCs and interior trades who want AI doing the area work. See Togal vs PlanSwift.

7. Kreo

Kreo is browser takeoff plus estimating with prices in the open: Essential at $100 per user per month with no AI, Pro at $175 with AI takeoff, both billed annually, and a 7-day free trial. Essential works out to $1,200 a year, well under PlanSwift. Best for: cost estimators who want a cloud tool and a published price.

8. eTakeoff Dimension

A manual desktop takeoff tool at $795 (Advanced) or $1,495 (Premier) per user per year, with a tight link to Sage Estimating and an optional Togal.ai add-on at $1,800. Third-party listings describe it as Windows desktop. Best for: Sage shops and anyone who wants a familiar desktop tool for less than half PlanSwift's price.

PlanSwift alternative for Mac

PlanSwift's own system requirements say it cannot be installed directly on a Mac; you need Boot Camp or a Windows virtual machine. Boot Camp does not exist on Apple Silicon, so on a recent MacBook that means a VM and a Windows licence on top of the PlanSwift seat.

The browser tools on this list avoid that: Pilars, STACK, Kreo, Togal.ai and ConstructConnect Takeoff run in Safari or Chrome. On-Screen Takeoff and eTakeoff are Windows desktop programs, and Bluebeam ended Revu for Mac in 2023, leaving only its web and mobile apps there. For PlanSwift-style manual takeoff on a Mac, STACK is the usual answer. More in PlanSwift for Mac and takeoff software for Mac.

Which PlanSwift alternative should you choose?

  • You want to stop tracing: Pilars. Run your own set through the live demo first.
  • You want the same workflow in a browser: STACK, or ConstructConnect Takeoff if you only need quantities.
  • You want to pay less per seat: Bluebeam Revu Core at $330, eTakeoff at $795 or Kreo Essential at $1,200 a year.
  • You do commercial interiors: On-Screen Takeoff or Togal.ai.
  • You rely on your assemblies every day: stay on PlanSwift.

On cost: three seats of PlanSwift are $6,000 a year on Essential or $9,000 on Core before multi-seat discounts. Three Pilars users are $900 a month, $10,800 a year, each on one trade with unlimited takeoffs. PlanSwift is the cheaper software at any bid volume; what Pilars changes is that the tracing hours no longer sit with your estimators. Whether that is worth the difference depends on what those hours cost you. Current figures are on our pricing page.

Questions estimators actually ask

What are the best PlanSwift alternatives in 2026?

The best PlanSwift alternatives in 2026 are Pilars ($300 per user per month, one trade per user with unlimited takeoffs), STACK (as low as $299 per user per month, with a free version), On-Screen Takeoff, ConstructConnect Takeoff, Bluebeam Revu ($260 to $590 per user per year), Togal.ai ($299 per user per month), Kreo (from $100 per user per month) and eTakeoff Dimension (from $795 per year).

Is there a PlanSwift alternative for Mac?

Yes. PlanSwift itself needs Windows, but Pilars, STACK, Kreo, Togal.ai and ConstructConnect Takeoff all run in a browser on a Mac with nothing to install.

What is cheaper than PlanSwift?

Bluebeam Revu ($260 to $590 per user per year), eTakeoff Dimension ($795 per user per year) and Kreo Essential ($1,200 per user per year) all cost less per seat than PlanSwift's $2,000 Essential tier. Pilars is not cheaper than PlanSwift: a Pilars user is $300 per month, $3,600 a year.

Which is cheaper for a three-estimator shop, PlanSwift or Pilars?

PlanSwift is cheaper. Three PlanSwift seats cost $6,000 a year on Essential or $9,000 on Core before multi-seat discounts. Three Pilars users cost $900 a month, $10,800 a year, each covering one trade with unlimited takeoffs; the case for Pilars is that the software does the first pass instead of the estimator.

Does PlanSwift have AI takeoff now?

Yes. PlanSwift Essential ($2,000 per year) includes Auto Count and Auto Scale, and PlanSwift Core ($3,000 per year) adds Auto Takeoff, the full Takeoff BOOST AI, based on the vendor's pricing page as of November 2026.

Can I change the quantities Pilars produces, the way I would in PlanSwift?

Yes. Pilars runs the first pass automatically, and the estimator can then open any detection, reclassify it, add or remove items, or adjust a boundary or quantity, with totals updating as edits are made.

See Pilars run a takeoff on your own plans. Book a call →