— Industry calendar

Construction industry events 2026–27

The central list of US construction events — drywall, painting, electrical, plumbing, HVAC, concrete, roofing, landscaping, estimating associations, construction tech and the national flagships. Dates, venues and prices checked against the organizers' own websites.

Last updated: July 12, 2026 · Always confirm dates on the official site before booking travel.

The next 12 months at a glance

Every event from July 2026 through July 2027, in date order. Industry tags: Drywall Painting Electrical Plumbing HVAC Concrete Roofing Landscaping Estimating Tech Flagship General

DatesEventLocationIndustry
July 2026
Jul 16–19ASCC Concrete Executive Leadership ForumHyatt Regency Chesapeake Bay, Cambridge, MDConcrete
Jul 21ASPE Orlando 50 Chapter MeetingVirtualEstimating
Jul 22–24AGC Construction Safety & Health ConferenceMinneapolis, MNGeneral
Jul 22–24Lawn & Landscape Technology ConferenceFairmont Scottsdale Princess, Scottsdale, AZLandscaping
Jul 23ASPE Webinar: How AI is Transforming EstimatingZoomEstimating
Jul 29 – Aug 2FWCCA Southeastern Wall & Ceiling ConventionCaribe Royale, Orlando, FLDrywall
August 2026
Aug 4–6AGC Technology ConferenceMinneapolis, MNTech
Aug 5–6AGC CLC Leadership Development ConferenceMinneapolis, MNGeneral
Aug 5–7ABC Carolinas Construction ConventionHilton Head Island, SCGeneral
Aug 11–12Houston Build ExpoNRG Park, Houston, TXGeneral
Aug 12–14AGC Oregon-Columbia Summer ConventionRiverhouse Lodge, Bend, ORGeneral
Aug 25–28IWF AtlantaAtlanta, GAGeneral
Aug 27ASPE Denver #5 Sporting Clay FundraiserBennett, COEstimating
Aug 30 – Sep 2APWA PWX (public works)Houston, TXGeneral
September 2026
Sep (TBA)ASCC Annual ConferenceTBA — see ascconline.orgConcrete
Sep 13–17IAPMO Annual Education & Business ConferenceSheraton Universal, Universal City, CAPlumbing
Sep 14–15PCA Craftsmanship & Painting ConferenceNashville, TNPainting
Sep 15–17Autodesk University 2026The Venetian, Las Vegas, NVFlagship
Sep 15–18PCA Residential ConferenceNashville, TNPainting
Sep 16–18CISCA TECH EastAlexandria, VADrywall
Sep 23–25GlassBuild AmericaLas Vegas Convention Center, NVFlagship
Sep 24–26ASPE Estimators Summit 2026Rosen Centre, Orlando, FLEstimating
Sep 27–30Western Roofing Expo (WSRCA)Paris Las Vegas, NVRoofing
Sep 29 – Oct 1AWCI Industry Leaders ConferenceIndian Wells, CADrywall
Sep 30 – Oct 2SiteOne Women in the Green Industry ConferenceNew Orleans, LALandscaping
October 2026 — the busiest month of the year
Sep 30 – Oct 1South Florida Build ExpoFort Lauderdale, FLGeneral
Oct 4–7NECA 2026 Convention & Trade ShowMandalay Bay, Las Vegas, NVElectrical
Oct 7–9CISCA TECH WestWest coast — see CISCA siteDrywall
Oct 7–9METALCONOrange County Convention Center, Orlando, FLFlagship
Oct 7–9CSI National ConferencePhoenix, AZFlagship
Oct 8–14ASPE Convention & Expo (plumbing engineers, biennial)Oklahoma City Convention Center, OKPlumbing
Oct 11–14ACI Concrete Convention — FallHilton Atlanta, GAConcrete
Oct 13–14Charlotte Build ExpoCharlotte, NCGeneral
Oct 14–17International Lineman's Rodeo & ExpoOverland Park / Bonner Springs, KSElectrical
Oct (TBA)Advancing MEP EstimatingTBAEstimating
Oct 18–21ICRI Fall Convention (concrete repair)Wild Horse Pass, Chandler, AZConcrete
Oct 19–22PHCC CONNECT 2026Baird Center, Milwaukee, WIPlumbing
Oct 20–23Equip Exposition + Hardscape North AmericaKentucky Expo Center, Louisville, KYLandscaping
Oct 20–23Greenbuild International Conference + ExpoJavits Center, New York, NYFlagship
Oct 21–22Procore GroundbreakOrange County Convention Center, Orlando, FLTech
Oct 21–24IEC SPARK — The Electrician's ExpoGreater Columbus Convention Center, OHElectrical
Oct 25–28PCA Women in Paint / PCA en EspañolSan Diego, CAPainting
Oct 25–28SMACNA Annual ConventionSignia Bonnet Creek, Orlando, FLHVAC
November 2026
Nov 4–5Los Angeles Build ExpoLos Angeles, CAGeneral
Nov 4–6DBIA Design-Build Conference & ExpoCleveland, OHFlagship
Nov 8–11ELEVATE by NALPTampa Convention Center, FLLandscaping
Nov 9–11Service World ExpoCaesars Forum, Las Vegas, NVHVAC
Nov 10–12RoofCONOklahoma City Convention Center, OKRoofing
Nov 10–13PCA Commercial ConferenceGrove Park Inn, Asheville, NCPainting
Nov 17–19MRCA Leadership SummitWestin Cape Coral, FLRoofing
Nov 17–19International Pool | Spa | Patio Expo + Deck ExpoMorial Convention Center, New Orleans, LAGeneral
December 2026
Dec 7–10Irrigation Show & Education WeekLas Vegas Convention Center, NVLandscaping
Dec 9–10Phoenix Build ExpoPhoenix, AZGeneral
January 2027
Jan 18–21World of Concrete 2027 (exhibits Jan 19–21)Las Vegas Convention Center, NVConcrete
Jan 18–21POWERGEN InternationalSalt Palace, Salt Lake City, UTElectrical
Jan 25–27AHR Expo 2027McCormick Place, Chicago, ILHVAC
Jan 25–27AED SummitRosen Shingle Creek, Orlando, FLGeneral
Late Jan (TBA)Painting Profits Summit 2027 (APPC)TBA (2026: Chattanooga, TN)Painting
February 2027
Feb 2–4NAHB International Builders' Show (IBS) + KBISLas Vegas Convention Center, NVFlagship
Feb 15–19PCA EXPO 2027TBA (2026: Orlando, FL)Painting
Feb 16–18International Roofing Expo (IRE) + NRCA 140th ConventionLas Vegas Convention Center, NVRoofing
Feb 22–25WWETT ShowIndiana Convention Center, Indianapolis, INPlumbing
Feb 25–26EPIC2027 (Contractor University)Mandalay Bay, Las Vegas, NVHVAC
March 2027
Mar 9–11ABC Convention 2027Gaylord Rockies, Aurora, COGeneral
Mar 10–12ACCA Conference & ExpoNational Harbor, MDHVAC
Mar 15–18Light + Intelligent Building North America (ex-LightFair)Las Vegas Convention Center, NVElectrical
Mar 21–24ACI Concrete Convention — SpringCaesars Palace, Las Vegas, NVConcrete
April – May 2027
Apr 6–8AGC Annual ConventionPhoenix Convention Center, AZGeneral
Apr 12–15BUILD27: AWCI's Convention + ExpoGaylord Texan, Grapevine, TXDrywall
Apr 26–30DBIA Transportation/Aviation + Water/WastewaterColorado Convention Center, Denver, COGeneral
Spring (TBA)NWCB Wall & Ceiling Conference 2027TBA (2026: Las Vegas, NV)Drywall
May 4–5ENR FutureTechHilton Union Square, San Francisco, CATech
May/Jun (TBA)Advancing Preconstruction 2027TBA (2026: Glendale, AZ)Estimating
June – July 2027
Jun (TBA)AACE International Conference & Expo 2027TBA (2026: Las Vegas, NV)Estimating
~Jun 14–17 (TBA)NFPA Conference & Expo 2027Henry B. Gonzalez CC, San Antonio, TXElectrical
Jul 7–9FRSA 105th Convention & Florida Roofing ExpoGaylord Palms, Kissimmee, FLRoofing
Late Jul (TBA)FWCCA Southeastern Convention 2027TBA (2026: Orlando, FL)Drywall

Drywall & wall-and-ceiling events

The wall-and-ceiling circuit runs on association shows: AWCI nationally, NWCB in the Northwest, FWCCA in the Southeast, CISCA for ceilings and interior systems. The flagships cluster in spring and fall — the FWCCA convention is the one major summer show.

DatesEventLocationWho it's for
Jul 29 – Aug 2, 2026 FWCCA Southeastern Wall & Ceiling Convention & Trade Show Caribe Royale Resort, Orlando, FL Wall & ceiling contractors, estimators, PMs — 100+ exhibitors, ~700 attendees. Trade floor free for contractors; golf tournament and awards luncheon. This summer
Sep 16–18, 2026 CISCA TECH East The Westin Alexandria Old Town, Alexandria, VA Built for project managers, supervisors and estimators in ceilings & interior systems. Fall
Sep 29 – Oct 1, 2026 AWCI Industry Leaders Conference Grand Hyatt Indian Wells Resort, Indian Wells, CA Executive-level wall-and-ceiling contractor leadership. Fall
Oct 7–9, 2026 CISCA TECH West West coast (see CISCA site) Western edition of CISCA's hands-on technical event. Fall
Apr 12–15, 2027 BUILD27: AWCI's Convention + Expo Gaylord Texan Resort, Grapevine, TX The largest US wall-and-ceiling trade show — drywall, ceilings, framing, plaster, EIFS, and software exhibitors. Booth sales opened July 1, 2026. 2027
Mar 15–18, 2026 BUILD26: AWCI's Convention + Expo New Orleans, LA Held — see BUILD27 above for the next edition. Held
Apr 30 – May 2, 2026 NWCB Wall & Ceiling Conference & Trade Show The M Resort, Las Vegas, NV Held — Northwest Wall & Ceiling Bureau's annual show returns spring 2027. Held
Jun 11–13, 2026 TLPCA Convention (Texas Lath & Plaster) Galveston, TX Held — Texas wall-and-ceiling association annual convention. Held

Painting & coatings events

The Painting Contractors Association (PCA) anchors the painting calendar: the giant EXPO each February, then a fall run of focused conferences. The coatings-manufacturing side (American Coatings Show) is biennial. There are no national painting events in mid-summer — plan around February and September.

DatesEventLocationWho it's for
Sep 14–15, 2026 PCA Craftsmanship & Painting Conference Nashville, TN Professional painting contractors — "master the art and science of painting excellence." Register now
Sep 15–18, 2026 PCA Residential Conference Holiday Inn & Suites Nashville Downtown–Broadway, Nashville, TN Residential painting contractors; back-to-back with Craftsmanship — one trip covers both. Register now
Oct 25–28, 2026 PCA Women in Paint / PCA en Español San Diego, CA PCA community conferences for women in the painting trade and Spanish-speaking contractors. Fall
Nov 10–13, 2026 PCA Commercial Conference The Omni Grove Park Inn, Asheville, NC Commercial painting contractors — the highest-value segment of the trade. Fall
Feb 15–19, 2027 PCA EXPO 2027 TBA (2026 was Disney World Swan & Dolphin, Orlando) The largest US painting-contractor trade show and convention. 2027
Jan 29–31, 2026 Painting Profits Summit (APPC) Chattanooga, TN Held — growth-stage painting business owners (avg ~$3.5M revenue). Watch for 2027 dates. Held
Feb 16–20, 2026 PCA EXPO 2026 Walt Disney World Swan & Dolphin, Orlando, FL Held — see EXPO 2027 above. Held
May 5–7, 2026 American Coatings Show & Conference Indiana Convention Center, Indianapolis, IN Held — coatings manufacturers & chemists. Biennial: next edition Mar 28–30, 2028 in Denver. Held

Construction estimator meetups & associations

If you estimate for a living, two associations matter: ASPE (American Society of Professional Estimators — local chapters, national webinars, and the annual Summit) and AACE International (cost engineering, heavier on industrial). Most ASPE chapters meet September–May and pause for summer; the national webinars run year-round.

DatesEventLocationWho it's for
Jul 21, 2026 · 5:30pm ET ASPE Orlando 50 Chapter Meeting — Prescriptive vs. Performance Specs Virtual Estimators nationwide; speaker Kevin Wagoner on the cost impact of spec types. This month
Jul 23, 2026 · 1pm CT ASPE Estimator's Edge Webinar — How AI is Transforming Estimating Analysis Zoom (national) All estimators; Rebecca Kassa, PhD (Simplar Foundation) on AI-powered estimating software. This month
Aug 27, 2026 ASPE Denver #5 — Sporting Clay Fundraiser Kiowa Creek Sporting Club, Bennett, CO Denver-area estimators; $150 individual / $850 team of five. This summer
Sep 24–26, 2026 ASPE Estimators Summit 2026 Rosen Centre Hotel, Orlando, FL The national annual gathering of professional construction estimators; $169/night room block. Register now
Sep 2026 onward ASPE local chapter meetings resume Chapters nationwide Monthly dinner meetings (typically 2nd week, Sept–May) — find your chapter on the ASPE site. Recurring
Jun 28–30, 2026 AACE International Conference & Expo MGM Grand, Las Vegas, NV Held — AACE's 70th-anniversary flagship for cost estimating & project controls. Next edition mid-2027. Held

Construction technology conferences

Where preconstruction and estimating technology gets evaluated and bought. If you're weighing AI takeoff tools, these are the rooms where the comparisons happen.

DatesEventLocationWho it's for
Aug 4–6, 2026 AGC Technology Conference Minneapolis Marriott City Center, Minneapolis, MN Tech & operations leaders at GCs and specialty contractors — AI, data, digital modeling, precon technology. Register at tech-con.agc.org. This summer
Jul 1–2, 2026 Nashville Build Expo Music City Center Hall D, Nashville, TN 150+ exhibitors, 36 free seminars incl. AI for contractor owners. Free to attend. Held
Aug 11–12, 2026 Houston Build Expo NRG Park Center Hall D, Houston, TX Free regional expo with contractor education classes (confirm exact dates with the organizer). This summer
Fall 2026 Build Expo — fall cities Fort Lauderdale (Sep 30–Oct 1) · Charlotte (Oct 13–14) · Los Angeles (Nov 4–5) · Phoenix (Dec 9–10) Same free format across four more metros. Fall

Regional & general contractor associations

ABC and AGC chapter conventions are where GC and specialty-contractor leadership — including drywall and paint subs — network regionally. Summer is chapter-convention season.

DatesEventLocationWho it's for
Jul 22–24, 2026 AGC Construction Safety & Health Conference Minneapolis, MN Safety and operations leaders at commercial contractors. This summer
Aug 5–6, 2026 AGC CLC Leadership Development Conference Minneapolis, MN Under-40 emerging construction leaders (runs alongside the Tech Conference). This summer
Aug 5–7, 2026 ABC of the Carolinas Construction Convention The Westin Hilton Head Island Resort & Spa, SC NC/SC merit-shop contractor leadership; AI innovation on the agenda. Member $1,250 · registration closes Jul 29. This summer
Aug 12–14, 2026 AGC Oregon-Columbia Summer Convention Riverhouse Lodge, Bend, OR Pacific NW commercial construction professionals. Member $875 (early $725) · non-member $1,200. This summer
Aug 25–28, 2026 IWF Atlanta Georgia World Congress Center, Atlanta, GA Woodworking & millwork industry — adjacent trade audience. Adjacent
Aug 30 – Sep 2, 2026 APWA PWX Houston, TX Public works professionals — infrastructure & municipal buyers. Adjacent

Flagship & national shows

The biggest rooms in US construction — tens of thousands of attendees, every trade represented. If you only do a few events a year, they come from this list.

DatesEventLocationWho it's for
Sep 15–17, 2026 Autodesk University 2026 The Venetian, Las Vegas, NV 10,000+ AEC & manufacturing pros — BIM managers, VDC leads, construction tech users. Tech
Sep 23–25, 2026 GlassBuild America Las Vegas Convention Center West Hall, NV Largest glass/window/door show in North America (2027: Oct 26–28, Orlando). Glazing
Oct 7–9, 2026 METALCON Orange County Convention Center, Orlando, FL Metal-construction contractors and fabricators. Passes $110 (super saver) – $195 onsite. Metal
Oct 7–9, 2026 CSI National Conference Phoenix, AZ Specifiers, architects and product reps (successor to CONSTRUCT). Specs
Oct 20–23, 2026 Greenbuild International Conference + Expo Javits Center, New York, NY Green-building professionals; USGBC/LEED community — first time in NYC. Green
Oct 21–22, 2026 Procore Groundbreak Orange County Convention Center, Orlando, FL Owners, GCs and specialty contractors in the Procore ecosystem. Early-bird $1,795 through Aug 24. Tech
Nov 4–6, 2026 DBIA Design-Build Conference & Expo Cleveland, OH The largest design-build event in the nation — owners, GCs, A/E firms. Design-build
Jan 18–21, 2027 World of Concrete 2027 Las Vegas Convention Center, NV ~47,000 concrete & masonry pros, 1,300+ exhibitors. Exhibits Jan 19–21; education Jan 18–21. Concrete
Jan 25–27, 2027 AED Summit Rosen Shingle Creek, Orlando, FL Equipment dealers/distributors and OEMs. Members $440–$1,225 by group size. Equipment
Feb 2–4, 2027 NAHB International Builders' Show (IBS) + KBIS Las Vegas Convention Center, NV 70,000+ home builders and remodelers (Design & Construction Week). 2026 reference pricing: expo+education $425–$995. Residential
Mar 9–11, 2027 ABC Convention 2027 Gaylord Rockies, Aurora, CO Merit-shop contractors; National Craft Championships + Excellence in Construction awards. General
Apr 6–8, 2027 AGC Annual Convention Phoenix Convention Center, AZ GC executives and specialty-contractor leadership. General
May 4–5, 2027 ENR FutureTech Hilton Union Square, San Francisco, CA AEC tech decision-makers — CIOs and VDC/innovation leads at ENR Top 400 firms. Tech
Mar 13–17, 2029 CONEXPO-CON/AGG (triennial — no 2026/27 edition) Las Vegas Convention Center, NV 140,000+ heavy-equipment and machinery professionals. Next edition is 2029. Equipment

Electrical events

NECA (union shops) and IEC (merit shops) both run their national conventions in October 2026 — three weeks apart. Lighting has consolidated into a biennial show; fire/electrical code lives at NFPA each June.

DatesEventLocationWho it's for
Oct 4–7, 2026 NECA 2026 Convention & Trade Show — 125th anniversary Mandalay Bay, Las Vegas, NV Union electrical contractors, power/light/communications pros, manufacturers. Pricing via registration portal. Electrical
Oct 14–17, 2026 International Lineman's Rodeo & Expo Overland Park Convention Center + Bonner Springs, KS 300+ lineman teams from 100+ utilities; safety conference is free. Electrical
Oct 21–24, 2026 IEC SPARK — The Electrician's Expo Greater Columbus Convention Center, Columbus, OH Independent/merit-shop electrical contractors and apprentices; early-bird pricing through Jul 20, 2026. Electrical
Jan 18–21, 2027 POWERGEN International Salt Palace, Salt Lake City, UT Power-generation and utility engineers, EPCs. Electrical
Mar 15–18, 2027 Light + Intelligent Building North America (ex-LightFair, biennial) Las Vegas Convention Center, NV Lighting designers, electrical distributors, smart-building pros. Electrical
~Jun 14–17, 2027 (TBA) NFPA Conference & Expo 2027 Henry B. Gonzalez Convention Center, San Antonio, TX NEC/NFPA 70 code, electrical inspectors, life-safety engineers (2026 edition was June, Las Vegas — held). Electrical

Plumbing events

October 2026 is plumbing month: the biennial ASPE engineering expo and PHCC CONNECT fall within two weeks of each other. WWETT in February is the giant of the wet side.

DatesEventLocationWho it's for
Sep 13–17, 2026 IAPMO Annual Education & Business Conference (100th) Sheraton Universal, Universal City, CA Plumbing/mechanical code officials and inspectors — UPC/UMC code development. Plumbing
Oct 8–14, 2026 ASPE Convention & Expo (plumbing engineers, biennial) Oklahoma City Convention Center, OK Plumbing engineers, designers, spec writers. Expo-only pass $25 (expo days Oct 12–13). Plumbing
Oct 19–22, 2026 PHCC CONNECT 2026 Baird Center, Milwaukee, WI Plumbing & HVACR contractors; national apprentice contest; product showcase Oct 20–21. Plumbing
Feb 22–25, 2027 WWETT Show Indiana Convention Center, Indianapolis, IN ~13,000 plumbing, septic, sewer and drain pros; registration opens fall 2026. Plumbing

HVAC & mechanical events

AHR Expo is the monster of the category — free if you register early. SMACNA covers the sheet-metal side; Service World and EPIC serve residential service shops.

DatesEventLocationWho it's for
Oct 25–28, 2026 SMACNA Annual Convention Signia by Hilton Bonnet Creek, Orlando, FL Sheet-metal/HVAC contractors and chapter executives. HVAC
Nov 9–11, 2026 Service World Expo Caesars Forum, Las Vegas, NV Residential HVAC/plumbing/electrical service business owners. Early-bird $799 through Aug 1, then $999. HVAC
Jan 25–27, 2027 AHR Expo 2027 McCormick Place, Chicago, IL HVACR engineers, contractors, distributors — free if registered by Jan 23, 2027; $30 after. HVAC
Feb 25–26, 2027 EPIC2027 (Contractor University / EGIA) Mandalay Bay, Las Vegas, NV Residential HVAC and home-services contractors focused on growth. HVAC
Mar 10–12, 2027 ACCA Conference & Expo National Harbor, MD HVACR contracting business leaders (1,000+); early-bird before Feb 2. HVAC

Concrete & masonry events

World of Concrete in January is one of the largest construction shows on earth. ACI's twice-yearly conventions carry the technical/code side; ASCC and ICRI serve contractors and repair specialists.

DatesEventLocationWho it's for
Jul 16–19, 2026 ASCC Concrete Executive Leadership Forum Hyatt Regency Chesapeake Bay, Cambridge, MD C-suite executives of concrete contracting firms. Concrete
Sep 2026 (TBA) ASCC Annual Conference TBA — call (314) 962-0210 Concrete contractor owners, decorative specialists, safety managers. Concrete
Oct 11–14, 2026 ACI Concrete Convention — Fall Hilton Atlanta, GA Concrete engineers, code committees, materials specialists. Concrete
Oct 18–21, 2026 ICRI Fall Convention Wild Horse Pass, Chandler, AZ Concrete repair/restoration contractors and engineers. Concrete
Jan 18–21, 2027 World of Concrete 2027 Las Vegas Convention Center, NV ~47,000 concrete & masonry contractors and estimators; includes Decorative Concrete LIVE! Exhibits Jan 19–21. Concrete
Mar 21–24, 2027 ACI Concrete Convention — Spring Caesars Palace, Las Vegas, NV Same ACI technical audience (Fall 2027: Oct 24–27, Caribe Royale Orlando). Concrete

Roofing events

The International Roofing Expo (with NRCA's annual convention inside it) is the national flagship each February. Western Roofing Expo and FRSA are the big regional shows; RoofCON is the sales/growth-culture gathering.

DatesEventLocationWho it's for
Sep 27–30, 2026 Western Roofing Expo (WSRCA) Paris Las Vegas, NV Western-US roofing & waterproofing contractors. Advanced $390 member / $520 non-member; trade-show-only free for contractors. Roofing
Nov 10–12, 2026 RoofCON Oklahoma City Convention Center, OK Growth-focused roofing & solar owners and sales teams; general admission currently free, VIP paid. Roofing
Nov 17–19, 2026 MRCA Leadership Summit Westin Cape Coral, FL Midwest roofing contractor leadership; tabletop showcase. Roofing
Feb 16–18, 2027 International Roofing Expo (IRE) + NRCA 140th Annual Convention Las Vegas Convention Center West Hall, NV The national roofing flagship — 700+ exhibitors, 165+ sessions at the 2026 edition. Roofing
Jul 7–9, 2027 FRSA 105th Convention & Florida Roofing Expo Gaylord Palms, Kissimmee, FL Largest regional roofing show in the US (250+ exhibitors); expo free for roofing contractors (2026 ref: $295–$995 for suppliers/service providers). 2026 edition was held Jun 10–12. Roofing

Landscaping & outdoor events

Equip Expo in Louisville is the giant (10,000+ attendees, $30 ticket). ELEVATE is the business conference; the Irrigation Show closes the year.

DatesEventLocationWho it's for
Jul 22–24, 2026 Lawn & Landscape Technology Conference Fairmont Scottsdale Princess, Scottsdale, AZ Green-industry owners adopting software and automation. $549 conference / $259 expo-only. Landscaping
Sep 30 – Oct 2, 2026 SiteOne Women in the Green Industry Conference New Orleans, LA Women professionals across the landscape industry; registration closes Aug 14. Landscaping
Oct 20–23, 2026 Equip Exposition + Hardscape North America Kentucky Exposition Center, Louisville, KY Landscape contractors, hardscapers, equipment dealers — $30 registration. Landscaping
Nov 8–11, 2026 ELEVATE by NALP Tampa Convention Center, FL Landscape company owners and executives (co-located with PGMS Transform). Landscaping
Dec 7–10, 2026 Irrigation Show & Education Week Las Vegas Convention Center, NV Irrigation contractors and water-management pros (trade floor Dec 9–10; co-located with Groundwater Week). Landscaping

Frequently asked questions

What is the biggest drywall trade show in the US?

AWCI's BUILD Convention + Expo is the largest trade show dedicated to the wall and ceiling industry. BUILD26 ran March 15–18, 2026 in New Orleans; BUILD27 is April 12–15, 2027 at the Gaylord Texan in Grapevine, TX. On the regional circuit, FWCCA's Southeastern Convention (Orlando, late July) and the NWCB show (Las Vegas, spring) are the majors.

Are there drywall or painting trade shows in July or August 2026?

One major one: the FWCCA Southeastern Wall & Ceiling Convention, July 29 – August 2, 2026 in Orlando. The painting calendar has no national summer events — PCA's next conferences run September 14–18 in Nashville. The industry's flagships cluster in spring and fall.

Where do construction estimators meet and network?

ASPE runs local chapter meetings (September–May in most cities), national Estimator's Edge webinars year-round, and the annual Estimators Summit — September 24–26, 2026 in Orlando. AACE International covers cost engineering with a June Conference & Expo and local sections. CISCA's TECH events are explicitly built for estimators in ceilings and interior systems.

Which conferences cover AI in estimating?

The AGC Technology Conference (August 4–6, 2026, Minneapolis) is the flagship construction-tech event. ASPE's July 23, 2026 national webinar is specifically about how AI is transforming estimating analysis. If you can't make either, you can see AI takeoff working on your own drawings in the Pilars live demo.

When is the next PCA EXPO?

PCA EXPO 2027 runs February 15–19, 2027 (the 2026 edition was held at the Walt Disney World Swan & Dolphin in Orlando). It's the largest US painting-contractor trade show.

What is the biggest HVAC trade show?

The AHR Expo — January 25–27, 2027 at McCormick Place, Chicago. It's the world's largest HVACR marketplace, and free if you register by January 23. SMACNA's convention (Oct 2026, Orlando) covers sheet-metal contractors; ACCA (Mar 2027) serves HVACR business leaders.

What is the biggest roofing trade show?

The International Roofing Expo, February 16–18, 2027 in Las Vegas, with NRCA's 140th Annual Convention inside it. The Western Roofing Expo (Sep 2026, Las Vegas) and FRSA's Florida expo (July 2027, Kissimmee) lead the regional circuit.

What are the biggest concrete and electrical events?

Concrete: World of Concrete, January 18–21, 2027, Las Vegas — ~47,000 attendees. Electrical: NECA's Convention (Oct 4–7, 2026, Las Vegas) for union contractors and IEC SPARK (Oct 21–24, 2026, Columbus) for merit shops.

— Can't make the show?

See AI takeoff on your plans instead.

The demos you'd walk the trade-show floor to see — running on your own drawing set, this week.

See Pilars run a takeoff on your own plans. Book a call →