Togal vs Bluebeam.
These two are compared constantly and compete less than people think. Bluebeam Revu is where the industry marks up drawings. Togal is a machine for getting areas and counts off them. The useful question is whether your Bluebeam seat already covers your takeoff, and whether the new Max plan changes that.
Togal vs Bluebeam: which should you use for takeoff?
Togal.AI is dedicated AI takeoff at $299 per user per month billed annually ($3,588 a year); the software measures and counts and the estimator reviews. Bluebeam Revu is PDF markup and collaboration with manual measurement tools at $260 to $590 per user per year, and the AI in its $590 Max plan is aimed at drawing review and comparison, not automated quantity takeoff. Use Bluebeam if takeoff is occasional and you already own it; add or choose Togal if takeoff volume is the bottleneck.
The price gap tells you they are not the same kind of product. One Togal seat costs about as much as eight Bluebeam Complete seats. Nobody pays that multiple for a slightly better measuring tool. They pay it because someone in the office spends most of the week measuring.
Pricing reviewed 13 November 2026, based on public documentation as of November 2026. Bluebeam labels the Max price as introductory. Togal.AI, Bluebeam and Revu are trademarks of their owners; this is an independent comparison.
Togal and Bluebeam compared
| Togal.AI | Bluebeam Revu | |
|---|---|---|
| What it is | AI-assisted takeoff. Not a markup or document tool | PDF markup, measurement and collaboration. Not a dedicated takeoff or estimating product |
| Who reads the drawings | AI first pass; the estimator reviews and corrects | The estimator, using measurement and count tools by hand |
| Platform | Browser | Revu for Windows desktop, plus Bluebeam on web and mobile. No Mac desktop app |
| Pricing model | Per user, billed yearly | Per user, billed yearly |
| Public price | $299 per user per month ($3,588 a year) | Basics $260, Core $330, Complete $440, Max $590 per user per year |
| AI | Automated detection, measuring and counting; AI plan search; drawing comparison | Max only: Smart Review, Smart Overlay, multi-view stitching, Magic Markups, AI integration via MCP |
| Best for | GCs and interior trades with heavy takeoff volume | GCs, architects, engineers and subs who need drawing review, with takeoff as a secondary use |
What a Bluebeam seat actually measures, plan by plan
Whether Bluebeam can cover your takeoff depends heavily on which Bluebeam you own. The tiers are not equal for estimating, and the cheapest one is a trap for anyone who counts.
- Basics, $260: length and area only. No count tool, no perimeter. Fine for a superintendent checking a slab; not enough for a bid.
- Core, $330: adds perimeter, count, angle and volume, plus overlay and compare. This is the minimum plan for real takeoff.
- Complete, $440: adds Dynamic Fill, Quantity Link to Excel, batch tools and scripting. This is the tier estimators want, because Quantity Link pushes measurements into a workbook.
- Max, $590: adds the AI features.
Feature placement here was read from Bluebeam's pricing page on the review date; confirm against the live plan table before buying, since vendors do move features between tiers.
With Core or Complete, a careful estimator can produce a perfectly good takeoff. Plenty of flooring and painting subs bid from Revu and a spreadsheet and have for years. It is manual work: you set the scale, pick the tool, and click every corner and every symbol. On a tenant fit-out that is an afternoon. On a 200-sheet school it is most of two weeks.
Do I still need Togal if I have Bluebeam Max?
Bluebeam Max launched globally in May 2026 and it prompted this exact question in a lot of offices. Going by what Bluebeam lists, the answer is that Max and Togal solve different problems.
Max's AI is about reviewing and comparing drawings. Smart Review checks drawings, Smart Overlay compares versions, multi-view stitching joins views, Magic Markups speeds up annotation, and the MCP integration lets an AI assistant work with Revu. Those help a project engineer catch a coordination miss or a changed detail between bid set and addendum. Bluebeam's pricing page does not list a feature that detects every room and returns the areas, or that counts every door on a floor without clicks. Third-party coverage also described Smart Review and Smart Overlay as preview features at launch.
Togal does that automated measuring and counting and nothing else. So:
- If you bought Max hoping the takeoff would do itself, it will not, and Togal (or another automated tool) is still the missing piece.
- If your takeoff load is light and Revu's manual tools have been enough, Max does not create a new need for Togal.
- If drawing comparison across addenda is the only thing you wanted from Togal, check Smart Overlay first; you may already be paying for it.
There is a fuller look at the plan in the Bluebeam Max review and at manual methods in can Bluebeam do takeoffs.
The cost of running both
Most firms that buy Togal keep Bluebeam, because Togal does not replace markups, RFIs on the sheet or Studio sessions. That makes the real decision "Bluebeam alone, or Bluebeam plus Togal".
| Per estimator, per year | Cost |
|---|---|
| Bluebeam Core alone | $330 |
| Bluebeam Complete alone | $440 |
| Bluebeam Max alone | $590 |
| Bluebeam Complete plus Togal | $4,028 |
| Bluebeam Max plus Togal | $4,178 |
The added $3,588 has to be earned back in hours. A simple way to test it: take the last three bids, write down the hours spent measuring in Revu, and ask what share of that was areas, wall lengths and repeat counts on architectural sheets. That is the portion Togal can shorten. If it comes to a few hours a month, stay on Bluebeam. If it is several days a month, the seat pays for itself quickly even after the clean-up time that G2 reviewers of Togal mention.
A practical middle path is to give Togal to the one or two people who do the bulk of the measuring and leave everyone else on Bluebeam. Togal lets outside collaborators view work without an account, so the whole team does not need a paid seat to see the result.
Best for: the verdict
Bluebeam is the better pick if
- Your main need is markup, review and collaboration, and takeoff is a few jobs a month
- You want the lowest cost per seat of any tool in this category
- Your estimators are on Windows and comfortable measuring by hand
- Design team coordination matters as much as quantities
Togal is the better pick if
- Takeoff is someone's full-time job and most of it is rooms, walls and finishes
- You bid enough volume that hours saved outweigh $3,588 a seat
- Estimators work on Macs, where there is no Revu desktop app
- You already price in your own system and only need the quantities faster
If you would rather not click at all
Bluebeam is manual and Togal is AI-assisted with a person steering. Pilars automates the first pass entirely: upload the plan set and the spec book, and within minutes the software has read all of it together, resolved schedules and references between sheets, counted and measured, and returned quantities with confidence scores and sheet sources. It runs in a browser on any machine.
What comes back is a draft the estimator controls, in the same spirit as editing a markup in Revu. Open any detection and reclassify it, delete it, add one the software missed or adjust a boundary, and the totals update. Nothing is final until the estimator says so.
Pilars sits beside Bluebeam the way Togal does, and it is priced like Togal, not like Revu: $300 per user per month, where a user is one estimator on one trade with unlimited takeoffs, billed monthly or annually, against $299 per user per month billed annually for Togal. A year comes to $3,600, about the cost of eight Bluebeam Complete seats, so Bluebeam is far cheaper and the case for Pilars rests on the software doing the first pass. It takes off 19 trades, including electrical, plumbing, HVAC and fire protection, where Togal is architectural-first. A mechanical sub with one estimator would spend $3,600 a year, however many sets the shop bids, and keep Revu for markups. A firm that only needs a quick area check on small jobs is better served by the Bluebeam seat it already has.
For accuracy evidence, Pilars publishes one test, duplex receptacle counting on one real power plan, where its model scored 97.5% and Togal scored 84%; Bluebeam was not tested. The method is on the benchmark page. Related reading: Pilars vs Bluebeam and Pilars vs Togal.
Questions estimators actually ask
Do I still need Togal if I already have Bluebeam Revu with the new Max AI features?
Possibly, yes. Bluebeam Max AI covers drawing review, drawing comparison, view stitching and markups, and Bluebeam does not list automated quantity takeoff, so Togal still fills that gap for teams with heavy takeoff volume.
Is Bluebeam cheaper than Togal?
Yes, by a wide margin. Bluebeam costs $260 to $590 per user per year depending on plan, and Togal costs $3,588 per user per year, based on public pricing reviewed in November 2026.
Can Bluebeam Revu do takeoffs without Togal?
Yes. Bluebeam Core adds count, perimeter and volume tools, and Bluebeam Complete adds Dynamic Fill and Quantity Link to Excel, so an estimator can complete a manual takeoff in Revu. Bluebeam Basics has length and area only.
What is the difference between Togal and Bluebeam?
Togal is an AI takeoff tool where the software measures and counts and the estimator reviews. Bluebeam Revu is a PDF markup and collaboration tool with manual measurement tools, used for takeoff as a secondary job.
Does Togal replace Bluebeam?
No. Togal produces quantities and does not replace Bluebeam markup, review or Studio collaboration, so most firms that buy Togal keep Bluebeam and pay for both.
Which works on a Mac, Togal or Bluebeam?
Togal works on a Mac because Togal runs in a browser. Bluebeam Revu for Mac reached end of life in June 2023, so Mac users get Bluebeam on web and mobile but not the Revu desktop app.
What can I add to Bluebeam for fully automated takeoff?
Pilars reads the plan set and spec book automatically across 19 trades, lets the estimator edit any detection, and scored 97.5% against 84% for Togal on one published duplex receptacle test. A team can keep Bluebeam for markup and add Pilars at $300 per user per month for one trade with unlimited takeoffs, billed monthly or annually, which is about the same as a Togal seat and far more than a Bluebeam seat.